Hydrofabric

Water
Operational
Describing the hydrofabric as a dataset.
Author

USGS/NOAA/Lynker

Published

September 11, 2026

Back to Data Sources

Hydrogaphy

A term that technically translates to study of water, this is most commonly found in the context of the applied science of measurements of the ocean floor but is often conflated with the study and representation of the flow of water over the earths surface and its’ representation. When you encounter someone talking about hydrography, they likely actually mean…

Hydrofabric

The most technically appropriate term for the conceptual standard as defined by the OGC1. As a concept though, I like to think of “hydrofabric” as the critical differentiator that separates planetary hydrology from earth hydrology. In planetary hydrology, we know nothing about the system that we are trying to model beyond coarse remote measurements, a “high quality” DEM if we’re lucky. On earth however, we have the advantage of long durations of meaningful measurements and an implied understanding of the system beyond what “just physics” might tell us, so when we try to model our system, it’s useful to know critical areas that we want to represent, the standard flow paths and channels that usually flow, and how basins delineate themselves. The hydrofabric product does this for us. As I like to say, particularly at the national scale, “water flows down channel, not water flows downhill”.

Quick links: Links to the official documentation, publication: (OGC® WaterML 2, n.d.), more information and the data bucket

3D Hydrofabric

If hydrofabric is the line/polygon representation of the hydrography of a system, 3D Hydrography is intended to walk all the way back to a point cloud. This is a long running program that is still finding it’s footing, and is still an active area for community to debate and come to a consensus. Our take is here: [[20241016192617]] Hydrofabric3D Data Model

Describing attributes

Figure 1

References

OGC® WaterML 2: Part 3 - Surface Hydrology Features (HY_Features) - Conceptual Model. n.d. Https://docs.ogc.org/is/14-111r6/14-111r6.html.

Footnotes

  1. see my Hydrofabric data model page↩︎